Bloomfield Updated Jun 24, 2026

200-Unit Mixed-Use Project Proposed for Bloomfield Center

Sorelle Crooks
Sorelle Crooks Realtor® Associate, Real Broker LLC
Commercial corridor along Bloomfield Avenue in Bloomfield NJ with historic buildings and storefronts

One of the biggest development proposals currently in Bloomfield's pipeline is a six-story mixed-use project at 675-699 Bloomfield Avenue and portions of State Street. If approved, it would bring 200 residential units and new community space to the Bloomfield Center area – making it one of the largest single projects the township has considered in recent years.

What's been proposed?

The project, submitted by CBD Bloomfield Developer Urban Renewal LLC, would clear the existing structures at the site and construct a new six-story mixed-use building. Here's what the plan includes:

  • 200 residential units – a mix of studio, one-bedroom, and two-bedroom apartments on floors two through six.
  • Ground-floor lobby and amenity space for residents.
  • Non-residential event space designated for the Church of the Sacred Heart, preserving a community function within the new development.

The project sits in the heart of Bloomfield Center, which aligns with the township's 2025 Master Plan vision for revitalizing commercial corridors and creating more walkable, transit-connected neighborhoods.

Where does it stand in the approval process?

As of mid-2025, the Bloomfield Planning Board reviewed the application and issued a planning review letter. This is part of the standard municipal approval process, which involves multiple hearings, environmental reviews, and opportunities for public comment. As of July 2026, the project remains in the pre-approval phase with no final decision reached.

The project has not been finally approved. It's still working through the planning and zoning review process, which for a project of this size typically takes considerable time. There will be additional public hearings before any final decision is made.

Why does this project matter?

For a few reasons:

It's part of a bigger trend

Bloomfield, like many Essex County towns, is seeing significant demand for housing – particularly from buyers relocating from New York City and younger professionals looking for modern rental or purchase options with access to transit. This project is a direct response to that demand.

It could reshape Bloomfield Center

A six-story building with 200 units would be one of the most prominent structures in the Bloomfield Center area. It would bring significantly more foot traffic to the commercial district, which could be a positive for local businesses – but also raises questions about parking, traffic, and whether the existing infrastructure can handle the density.

It preserves a community function

One notable element is the inclusion of event space for the Church of the Sacred Heart. This suggests the developer is working to maintain some of the existing community fabric rather than simply demolishing everything and starting from scratch. That kind of integration – where new development respects existing community institutions – is generally a positive sign.

What are the community concerns?

Projects of this scale always generate discussion. Here are the main questions residents and planning board members have been raising:

  • Traffic and parking. Adding 200 units – even with a mix of smaller apartments – means more cars on the road and more demand for parking in an area that already sees congestion during peak hours.
  • Height and scale. A six-story building is significantly larger than most of what exists in the Bloomfield Center area. Some residents have concerns about how it fits with the existing neighborhood character.
  • Infrastructure capacity. More residents means more demand on water, sewer, electric, and stormwater systems. Bloomfield has been investing in infrastructure upgrades – including the 2025 Roadway Improvement Program and PSE&G electric work – but adding density always tests capacity.
  • Construction disruption. A project of this scale will take years to build. Nearby residents and businesses will experience significant construction activity during that time.

What this means for homeowners

If you own property in or near Bloomfield Center, this is one to watch closely. Major mixed-use developments can have both positive and negative effects on surrounding property values:

  • Potential positives: More foot traffic supporting local businesses, modernization of the commercial corridor, new amenities, and increased demand for the area.
  • Potential negatives: Construction disruption, increased traffic, changes to neighborhood character, and the uncertainty of living next to a major development site.

The net effect depends on how well the project is designed and executed, and whether the township manages the supporting infrastructure effectively.

What this means for buyers

If you're considering buying in Bloomfield Center, understanding this project's status and timeline is important. A new 200-unit building nearby could mean modern amenities and a more vibrant neighborhood – or it could mean years of construction activity. Either way, having accurate information helps you make a better decision about timing and location.

The bottom line

The proposed Bloomfield Center mixed-use project is still in the planning stages, and there's a long road ahead before any final approvals or construction. But it's a clear signal that Bloomfield's downtown is in a period of transition – and for homeowners and buyers, understanding that trajectory matters.

I'll be following this project through the planning process. If you have questions about what it means for a specific property or neighborhood in Bloomfield, I'm happy to talk through it.

Last verified: July 28, 2026. The project remains in the planning and approval phase with no final decision reached as of this date.

Have a tip about local development?

I cover local real estate and development news across Bloomfield, West Orange, Montclair, and Essex County. If you hear about new construction, zoning changes, or neighborhood issues, I'd love to hear about it.

Call
Book a Consultation
Email